Previous page Print
Previous page Print

The specific works accomplished are


Publication Date 2019-09-19
  • facebook
  • twitter
  • line
  1. Survey the models and the manufacturers of flight recorders.
  2. Survey the format of the flight data readout database.
  3. Survey the models and the manufacturers of FDAU.
  4. Survey the installation of FOQA system.
  5. Statistics of the installation of flight recorders in civil aviation aircraft.
  6. Statistics of the installation of QAR in civil aviation aircraft.
  7. Statistics of the installation of flight recorders in public aircraft.
  8. Statistics of the installation of portable GPS devices and light weight recorders (LWR) in public aircraft and general aviation aircraft which are not installed flight recorders.
  9. Analysis of laboratory readout capability of the flight recorders.
Last updated 2019-09-19
Count Views 860次
回頁首